The E-75 Standardpanzer was intended to be the standard heavy tank to be used as a replacement of the Tiger II and Jagdtiger. The E-75 would have been built on the same production lines as the E-50 for ease of manufacture, and the two vehicles were to share many components, including the same Maybach HL 234 engine. The E-75 would have had much thicker armour however, and in fact compared to the Tiger II the E-75 had improved hull armor all round. As its name indicates, the resulting vehicle would have weighed in at over 75 tonnes, reducing its speed to around 40 km/h. To offset the increased weight, the bogies were spaced differently than on the E-50, with an extra pair added on each side, giving the E-75 a slightly improved track to ground contact length.